Oakland County
WB I-696 Ramps from I-75 to M-10 to Close Starting Nov 14 for Traffic Shift
WB I-696 ramps from I-75 to M-10 will probably be closed starting November 14 as a result of site visitors shift
SOUTHFIELD, MI – Because the newly rebuilt eastbound I-696 lanes from M-10 to I-75 transfer nearer to completion, crews plan to make the change I-696 westbound traffic from I-75 to M-10 to the east aspect to rebuild the westbound lanes. This site visitors interchange limits the on and off ramps out there to westbound site visitors. These works are climate dependent and, if postponed, will happen the next weekend.
From 8:00 PM on Friday, November 14 by way of 10:00 AM on Sunday, November 16, the next ramps to I-696 westbound will probably be closed (re-access is at M-10 (Lodge Freeway)/Lahser Highway):
- Couzenslaan
- Bermuda/Hilton Highway
- M-1 (Woodward Avenue)
- Coolidge Freeway
- Greenfield Highway
- Zuidveldweg
- Evergreen street
From Saturday, November 15, 4 a.m. to Sunday, November 16, 10 a.m.:
- The ramps from northbound and southbound I-75 (exit 61) to westbound I-696 will probably be closed.
- Westbound I-696 is closed from I-75 to Lahser Highway. The proposed detour is I-75 southbound, M-8 westbound (Davison Freeway) and M-10 northbound (Lodge Freeway) to I-696 westbound.
Starting at 10 a.m. Sunday, November 16 by way of the top of 2026, I-696 westbound could have three lanes open from I-75 to Lahser Highway, with solely the next entrance/exit ramps open:
- I-75
- M-1 (Woodward Avenue)
- Zuidveldweg
- US-24 (Telegraph Highway)/M-10 (Lodge Freeway)/Lahser Highway
The next westbound ramps will probably be closed till the top of 2026 (all eastbound ramps will even stay closed):
- Couzenslaan
- Bermuda/Hilton Highway
- Coolidge Freeway
- Greenfield Highway
- Evergreen street
The ultimate part of the Restore the Reuther challenge consists of finishing I-696 reconstruction in 2026, whereas in 2027 I-696 will conduct main roadwork between I-75 and Dequindre Highway. That work consists of rebuilding the roadway, bridge enhancements and drainage buildings.
As a part of the challenge, 60 bridges are being repaired, together with the reconstruction of the Church Avenue Plaza bridge, which incorporates Victoria Park, is continuous and a footbridge diversion is in place.
Venture data is out there at https://DrivingOakland.com/
-
Michigan8 months agoUS District Judge rules that President Trump can dismantle USAID
-
Macomb County7 months agoWho’s running for Michigan’s 10th Congressional District?
-
National News8 months agoWATCH LIVE: Stranded NASA astronauts heading back to Earth in SpaceX capsule
-
Michigan8 months agoPresident Trump’s Address to Congress – Key Takeaway
-
Michigan6 months agoWhen is Holland’s tulip festival? What to know about the west Michigan event
-
Michigan6 months ago5 common Michigan snakes you may see as the weather warms
-
Michigan7 months agoMichigan hunter? Here’s a list of the hunting seasons for 2025
-
Oakland County6 months agoLa Loulou brings a slice of Paris to Piedmont Ave., Cafe Noir moves to Prescott Market













