Michigan
Livonia’s ‘Built Bond Proposal’ has residents split as mayor pushes for approval
Livonia, Mich. (Fox 2) – With the election day virtually right here for Metro Detroiters, a giant hole is going on in Livonia a few proposed band.
The mayor of Livonia mentioned that because the bond, the bell Livonia constructed bond proposalShouldn’t be accepted, town must spend cash on a big, costly plaster.
“That is $ 150 million funding that residents of Livonia shall be requested in the middle of the subsequent 25 years,” mentioned Mayor Maureen Miller Brosnan.
Massive Image View:
If accepted, the bond would supply financing for initiatives that embrace the development or renovation of outdated public security buildings for police and fireplace, a library and a central gathering area.
“And create a pond weight with bicycles and walkways, all linked to a big greenway that connects 5 miles and Farmington Street that’s room for festivals and gala’s,” mentioned Miller.
Nonetheless, not everyone seems to be on board. The opposition is of the opinion that tax {dollars} needs to be spent differently. The mayor informed Fox 2 that if the bond has not been accepted, cash shall be spent on patching outdated buildings.
“For $ 104 million we purchase a big plaster in the middle of the subsequent 10 years doesn’t sound like an excellent plan B,” mentioned Miller.
What they are saying:
The mayor mentioned that part one of many challenge was made doable by subsidies and fundraising.
“Like the place we now stand when constructing a brand new senior middle,” mentioned Miller. “So the final a part of this puzzle is to ask the taxpayers to assist us end the challenge.”
Why you must save:
Within the meantime, it might be round $ 12 a month or $ 144 per 12 months for the typical Livonia proprietor.
Because the election day will get nearer, the mayor works to not make the potential voices in JA -voemen to get the bond accepted.
The supply: Fox 2 spoke with the mayor and residents of Livonia for info on this report.