Oakland County
Road Watch: Macomb and Metro Detroit construction week of Nov. 29 and beyond
14 Mile Highway
Fourteen Mile Highway between Kelly Highway and Gratiot Avenue (M-3) in Clinton Township and Roseville. One lane can be maintained for westbound visitors, whereas eastbound visitors can be closed. All companies and properties will stay accessible throughout the venture. Drivers are inspired to comply with posted detours and search alternate routes. The venture consists of highway repairs and can run till November.
Fourteen Mile Highway between Van Dyke Avenue/M-53 and Hoover Highway in Sterling Heights. The highway will stay open and visitors will stay doable through the development work. The venture consists of highway rehabilitation. Drivers ought to count on delays and are inspired to search out various routes. The length of the venture is till November.
Clinton River Path
As a result of a washout on the Clinton River Path in Rochester, the path west of the Macomb Orchard Path and Dequindre Highway is closed. Observe the indicated diversion route.
Dequindre Highway, Shelby Twp.
The Clinton River Path and Macomb Orchard Path between Letica Drive and 24 Mile Highway stay closed. Drivers are inspired to comply with posted detours and search alternate routes if doable. The venture consists of the set up of a brand new 96-inch water transmission pipeline and is a part of the GLWA venture. Venture length till December 31.
McKishnie Road
McKishnie Road in Clinton Township. The highway will stay open and visitors can be maintained always to permit residents to enter and exit the sub-area. The venture consists of highway reconstruction and is a part of MCDR’s 2025 Subdivision Preservation Program. It’s anticipated to final by way of November.
Powell Highway
Powell Highway between 30 and a half miles highway and 32 Mile Highway in Washington Township. Drivers are inspired to comply with designated detours on Van Dyke Avenue, M-53 and Romeo Plank Highway and are inspired to hunt alternate routes. All companies and properties will stay accessible throughout the venture. Venture consists of reconstruction. The length of the venture is till July 2026.
I-94
In Macomb County, the eastbound I-94 ramp to 21 Mile Highway may have one ramp open for concrete repairs by way of Dec. 8.
In Wayne County, the westbound I-94 ramp to Pelham is closed till December 19 for bridge work.
In Wayne County, the ramp from eastbound I-94 to northbound M-39/Southfield may have one lane open till December for ramp repairs.
I-275
In Wayne County, the ramp from northbound I-275 to westbound M-14 can be closed for development by way of December 30.
I-696
In Oakland County, the westbound I-696 ramps that may shut from I-75 to M-10 by way of the tip of 2026 as a consequence of visitors shifts are:
The ramps from northbound and southbound Campbell Highway to westbound I-696 are closed
The northbound and southbound Coolidge Freeway ramps to westbound I-696 are closed.
The northbound and southbound Couzens Avenue ramps to westbound I-696 are closed
Northbound and southbound Evergreen Highway ramp to westbound I-696 closed
The northbound and southbound Greenfield Highway ramp to westbound I-696 is closed.
In Oakland County, westbound I-696 ramps can be closed by way of the tip of 2026 as a consequence of visitors shifts:
Westbound I-696 ramp to Bermuda/Mohawk
Westbound I-696 ramp to Coolidge
Westbound I-696 ramp to Greenfield
Westbound I-696 ramp to Evergreen
I-75
In Oakland County, the southbound Dixie Freeway/US-24 ramp to southbound I-75 can be closed till the tip of November as a consequence of visitors shifts.
M-39 (Southfield)
In Wayne County, the ramp from northbound M-39 to westbound I-94/Van Born may have one lane open for bridge work by way of the tip of December.
In Wayne County, the ramp from northbound M-39 to westbound I-94 can be closed till December for ramp work.
In Wayne County, the ramp from northbound M-39 to eastbound I-94 can be closed till December for ramp work.
In Wayne County, the ramp from southbound M-39 to eastbound I-94 can be closed till December for ramp work.
US-12 (Michigan)
In Wayne County, eastbound US-12 may have one lane open from Greenfield to I-94 by way of the tip of 2025 for highway repairs.
In Wayne County, eastbound and westbound US-12 may have one lane open from Greenfield to I-94 for paving by way of the tip of 2025.
US-24 (telegraph)
In Wayne County, southbound US-24 may have one lane open from Northline to Eureka by way of December 6 for bridge work.
— Staff of the MediaNews Group
-
Michigan9 months agoUS District Judge rules that President Trump can dismantle USAID
-
Macomb County8 months agoWho’s running for Michigan’s 10th Congressional District?
-
National News9 months agoWATCH LIVE: Stranded NASA astronauts heading back to Earth in SpaceX capsule
-
Michigan8 months agoWhen is Holland’s tulip festival? What to know about the west Michigan event
-
Michigan9 months agoPresident Trump’s Address to Congress – Key Takeaway
-
Michigan8 months ago5 common Michigan snakes you may see as the weather warms
-
Michigan8 months agoMichigan hunter? Here’s a list of the hunting seasons for 2025
-
Oakland County7 months agoLa Loulou brings a slice of Paris to Piedmont Ave., Cafe Noir moves to Prescott Market

